Betekenis van:
365 days

365 days
Zelfstandig naamwoord
    • a year that is not a leap year

    Synoniemen

    Hyperoniemen


    Voorbeeldzinnen

    1. It goes around the sun in 365 days.
    2. The earth makes one revolution around the sun in about 365 days.
    3. maximum 365 days for the products stored in the period referred in paragraph 2(b).’;
    4. A year is presumed to have 365 days (or 366 days for leap years), 52 weeks or 12 equal months.
    5. A year is presumed to have 365 days (or 366 days for leap years), 52 weeks or 12 equal months. An equal month is presumed to have 30,41666 days (i.e. 365/12) regardless of whether or not it is a leap year.
    6. An equal month is presumed to have 30,41666 days (i.e. 365/12) regardless of whether or not it is a leap year.
    7. Reporting agents apply a standard year of 365 days for the compilation of the AAR, i.e. the effect of an additional day in leap years is ignored.
    8. The Netherlands, in its letter of October 2005, claims that the figure of 500000 — 700000 tonnes mentioned by Euromalt as being the overcapacity of the Community malting industry is based on so-called ‘nameplate’ capacities, i.e. production 24 hours a day, 7 days a week, 365 days a year.
    9. The same letter mentions an overcapacity in the Community malting industry of at least 500000 — 700000 tonnes. The Netherlands, however, claims that this figure is based on a production of 24 hours a day, 7 days a week, 365 days a year.
    10. The early repayment penalty is calculated as follows: EUR 650000000 * (number of securities repurchased/500000000) * (days from issue)/365) * (prevailing price – 10)/(12,5 – 10) where prevailing price is the average of the market price 5 days before repayment, it is higher or equal to EUR 11,20 and lower or equal to EUR 12,45.
    11. The Netherlands, in its letter of October 2005, claims that the figure of 500000 — 700000 tonnes mentioned by Euromalt as being the overcapacity of the Community malting industry is based on so-called ‘nameplate’ capacities, i.e. production 24 hours a day, 7 days a week, 365 days a year. Periods when plants are at a standstill owing to maintenance, technical failures and overhaul are not taken into account, which makes it uncertain whether overcapacity actually exists.