Betekenis van:
bridge deck
bridge deck
Zelfstandig naamwoord
- deel van schip
- an upper deck where a ship is steered and the captain stands
Synoniemen
Hyperoniemen
Hyponiemen
bridge deck
Zelfstandig naamwoord
- loopplank, loopbrug
- an upper deck where a ship is steered and the captain stands
Synoniemen
Hyperoniemen
Hyponiemen
Voorbeeldzinnen
- .2.1 All accesses from the ro-ro deck that lead to spaces below the bulkhead deck shall be made weathertight and means shall be provided on the navigation bridge, indicating whether the access is open or closed;
- The maximum vertical deflection of a bridge deck shall not exceed the values set out in Annex A2 to EN 1990:2002.
- .1.2 where vehicle ramps are installed to give access to spaces below the bulkhead deck, their openings shall be able to be closed weathertight to prevent ingress of water below, alarmed and indicated to the navigation bridge;
- Remote operating positions shall only be at the navigating bridge as required by paragraph .7.1.5 and the location where hand operation above the bulkhead deck is required by paragraph .7.1.4.
- ICCAT observers shall be provided with adequate space on the bridge or pilot house for clerical work, as well as space on deck adequate for carrying out observer duties; and
- .1.1 Subject to the provisions of paragraphs .1.2 and .1.3, all accesses that lead to spaces below the bulkhead deck shall have a lowest point which is not less than 2,5 metres above the bulkhead deck; .1.2 where vehicle ramps are installed to give access to spaces below the bulkhead deck, their openings shall be able to be closed weathertight to prevent ingress of water below, alarmed and indicated to the navigation bridge;
- .1.2 where vehicle ramps are installed to give access to spaces below the bulkhead deck, their openings shall be able to be closed weathertight to prevent ingress of water below, alarmed and indicated to the navigation bridge; .1.3 the Administration of the flag State may permit the fitting of particular accesses to spaces below the bulkhead deck provided they are necessary for the essential working of the ship, e.g. movement of machinery and stores, subject to such accesses being made watertight, alarmed and indicated to the navigation bridge;
- Commission Decision 2003/722/EC of 6 October 2003 on the procedure for attesting the conformity of construction products pursuant to Article 20(2) of Council Directive 89/106/EEC as regards liquid-applied bridge deck waterproofing kits (OJ L 260, 11.10.2003, p. 32)
- Commission Decision 2003/722/EC of 6 October 2003 on the procedure for attesting the conformity of construction products pursuant to Article 20(2) of Council Directive 89/106/EEC as regards liquid-applied bridge deck waterproofing kits (OJ L 260, 11.10.2003, p. 32).
- .1.3 the Administration of the flag State may permit the fitting of particular accesses to spaces below the bulkhead deck provided they are necessary for the essential working of the ship, e.g. movement of machinery and stores, subject to such accesses being made watertight, alarmed and indicated to the navigation bridge;
- The maximum permitted peak design values of bridge deck acceleration calculated along the line of a track shall not exceed the values set out in Annex A2 to EN 1990:2002.The design of bridges shall take into account the most unfavourable effects of either the vertical loads specified in § 4.2.14.1 or load model HSLM, in accordance with EN 1991-2:2003 paragraph 6.4.6.5 (3).
- Reference is made to the information contained in Regulation 2.7 in the in the High Speed Craft Code 2000. 19 Damage control plans (R 23) NEW CLASS B, C AND D AND EXISTING CLASS B SHIPS: There shall be permanently exhibited, for the guidance of the officer in charge of the ship, plans showing clearly for each deck and hold the boundaries of the watertight compartments, the openings therein with the means of closure and position of any controls thereof, and the arrangements for the correction of any list due to flooding. In addition, booklets containing the aforementioned information shall be made available to the officers of the ship. 20 Integrity of the hull and superstructure, damage prevention and control (R 23-2) .1 Indicators shall be provided on the navigating bridge for all shell doors, loading doors and other closing appliances which, if left open or not properly secured, could lead to flooding of a special category space or ro-ro cargo space. The indicator system shall be designed on the fail-safe principle and shall show by visual alarms if the door is not fully closed or if any of the securing arrangements are not in place and fully locked and by audible alarms if such door or closing appliances become open or the securing arrangements become unsecured. The indicator panel on the navigating bridge shall be equipped with a mode selection function “harbour/sea voyage” so arranged that an audible alarm is given on the navigation bridge if the ship leaves harbour with the bow doors, inner doors, stern ramp or any other shell doors not closed or any closing device not in correct position.
- .2 If in such a ship the total number of passengers, including persons accompanying vehicles, does not exceed N = 12 + A/25, where A = total deck area (square metres) of spaces available for the stowage of goods vehicles and where the clear height at the stowage position and at the entrance to such spaces is not less than 4 metres, the provisions of Regulation 13, paragraph .10, in respect of watertight doors apply except that the doors may be fitted at any level in watertight bulkheads dividing cargo spaces. Additionally, indicators are required on the navigating bridge to show automatically when each door is closed and all door fastenings are secured. .3 When applying the provisions of this chapter to such a ship, N shall be taken as the maximum number of passengers for which the ship may be certified in accordance with this Regulation. 15 Openings in the shell plating below the margin line (R 17) NEW CLASS B, C AND D AND EXISTING CLASS B SHIPS: