Betekenis van:
ism


Voorbeeldzinnen

  1. (INTERNATIONAL SAFETY MANAGEMENT (ISM) CODE)
  2. PROVISIONS FOR THE ADMINISTRATION CONCERNING THE IMPLEMENTATION OF THE INTERNATIONAL SAFETY MANAGEMENT (ISM) CODE
  3. Instruction 39/2006/01: Guidelines for the Port State Control Officer on the ISM-Code,
  4. the terms of reference which the ISM Code requires that companies should take into account;
  5. If applicable. Reference is made to paragraph 13.8 of the ISM Code and paragraph 3.4.1 of the Guidelines on Implementation of the International Safety Management (ISM) Code by Administrations (Resolution A.913(22)).
  6. INTERNATIONAL MANAGEMENT CODE FOR THE SAFE OPERATION OF SHIPS AND FOR POLLUTION PREVENTION (INTERNATIONAL SAFETY MANAGEMENT (ISM) CODE)
  7. This was a first step towards ensuring uniform and coherent implementation of the ISM Code in all Member States.
  8. Such information (the ISM report) must include, but is not limited to, the following (see sections 3.1.1 to 3.1.13):
  9. They shall have undergone training to ensure adequate competence and skills for performing verification of compliance with the requirements of the ISM Code, particularly with regard to: (a) knowledge and understanding of the ISM Code;
  10. THIS IS TO CERTIFY THAT, at the periodical verification in accordance with [Regulation IX/6.1 of the Convention and paragraph 13.8 of the ISM Code and] Article 6 of Regulation (EC) No 336/2006 on the implementation of the ISM Code within the Community, the safety management system was found to comply with the requirements of the ISM Code.
  11. The ISM Code was amended by the IMO by Resolution MSC.104(73), adopted on 5 December 2000.
  12. International Management Code for the Safe Operation of Ships and for Pollution Prevention (International Safety Management (ISM) Code)
  13. Such information (the ISM report) shall include, but is not limited to, the following (see paragraphs 3.1.1. to 3.1.13.):
  14. THIS IS TO CERTIFY THAT, at the periodical verification in accordance with [Regulation IX/6.1 of the Convention and paragraph 13.4 of the ISM Code and] Article 6 of Regulation (EC) No 336/2006 on the implementation of the ISM Code within the Community, the safety management system was found to comply with the requirements of the ISM Code.
  15. For the purposes of the first subparagraph ISM Code related deficiencies shall be weighted at 5 points while any other deficiencies shall be weighted at 1 point.