Betekenis van:
load line
load line
Zelfstandig naamwoord
- laadlijn
- waterlines to show the level the water should reach when the ship is properly loaded
Synoniemen
Hyperoniemen
load line
Zelfstandig naamwoord
- diepgangsmerk
- waterlines to show the level the water should reach when the ship is properly loaded
Synoniemen
Hyperoniemen
Voorbeeldzinnen
- load line requirements:
- International Load Line Exemption Certificate.
- International Load Line Certificate (1966);
- .4 Draught is the vertical distance from the moulded base line amidships to the subdivision load line in question.
- the positive torque line (i.e. engine load with the transmission in neutral);
- .5 In no case shall any subdivision load line mark be placed above the deepest load line in salt water as determined by the strength of the ship or the International Convention on Load Lines in force.
- the maximum load line of the cabinet shall be clearly marked;
- Subdivision load line is the waterline used in determining the subdivision of the ship.
- .1 .1 Subdivision load line is the waterline used in determining the subdivision of the ship.
- Subdivision load line is the waterline used in determining the subdivision of the ship. 2. Deepest subdivision load line is the waterline which corresponds to the greatest draught permitted by the subdivision requirements which are applicable.
- .6 Whatever may be the position of the subdivision load line marks, a ship shall in no case be loaded so as to submerge the load line mark appropriate to the season and locality as determined in accordance with the International Convention on Load Lines in force. .7 A ship shall in no case be so loaded that the subdivision load line mark appropriate to the particular voyage and condition of service is submerged.
- If there is more than one subdivision load line, the alternative conditions shall be identified by the notations C.2, C.3, C.4 etc. [2]..3 The freeboard corresponding to each of these load lines shall be measured at the same position and from the same deck line as the freeboards determined in accordance with the International Convention on Load Lines in force.
- .6 Whatever may be the position of the subdivision load line marks, a ship shall in no case be loaded so as to submerge the load line mark appropriate to the season and locality as determined in accordance with the International Convention on Load Lines in force.
- .2 The subdivision load lines assigned and marked shall be recorded in the Passenger Ship Safety Certificate, and shall be identified by the notation C.1 if there is only one subdivision load line.
- Provide information required to produce train consists, including brake mass, length over buffers, tare weight, speed versus load table for different line categories.