Betekenis van:
outfitting
outfitting
Zelfstandig naamwoord
- the act of renovating and fitting out a ship
Hyperoniemen
Hyponiemen
Voorbeeldzinnen
- Third, the section outfitting will be done at an earlier stage in the production process, which will bring efficiency gains, compared to the current practice of carrying out the outfitting on completed hulls, particularly in the case of the piping.
- The Commission takes note of Italy's statement that the outfitting time for some previous ships was reduced to seven or even six months.
- .4 All ships which undergo repairs, alterations, modifications and outfitting related thereto shall continue to comply with at least the requirements previously applicable to these ships.
- This would have involved, in the Commission's estimation, twice as much outfitting work in 2003 as Fincantieri had ever done in any other year.
- Furthermore, Ancona had never built a ship of similar complexity before, casting doubts on the ability to manage this operation, not least concerning outfitting.
- However, this took place in shipyards that were able to work in the normal way, outfitting one ship at a time.
- They also claim that it would have been possible to accomplish the necessary outfitting within the deadline with the help of the network of subcontractors.
- Assembly will be carried out on the docks at Gdynia Shipyard and final outfitting will take place at quays in both yards.
- In the decision initiating the formal procedure, the Commission estimated that delivery of all five ships plus all the other ships planned would have involved twice as much outfitting work as Fincantieri had ever done before, and that for the Marghera shipyard the outfitting planned for 2003 would have amounted to around 40 % more than the yard had ever done before.
- First, assembly of the larger sections has to be partially done on water. Second, often the sections do not reach the critical size to enable outfitting, in particular in the case of the piping.
- Linked to this, the construction of ship 6077 at Ancona would have implied an exceptionally high amount of outfitting at the Palermo shipyard because of the shift of production from Ancona to Palermo.
- The outfitting work is particularly critical for hulls 6078 and 6079, which were both planned to be built at the Marghera shipyard and delivered before the end of December 2003, with an interval of only two months between them.
- The Commission therefore considers that the Palermo yard would not have been able to fulfil the December 2000 plan as regards outfitting, and Italy has not given any reply on this point.
- The Commission also notes that the information provided by Italy and Fincantieri shows that it was not clear in December 2000 whether the outfitting of ship 6077 was intended to take place at ATSM or at Ancona.
- The outdoor assembly capacity will be extended by a new facility on rail 8, equipped with a 50 t crane, which corresponds to the cranage capacity of the outfitting berth.