Betekenis van:
shunt

to shunt
Werkwoord
  • los- en vastkoppelen
  • transfer to another track, of trains

Hyperoniemen

to shunt
Werkwoord
    • provide with or divert by means of an electrical shunt

    Hyperoniemen

    shunt
    Zelfstandig naamwoord
      • a passage by which a bodily fluid (especially blood) is diverted from one channel to another
      "an arteriovenus shunt"

      Hyperoniemen

      Hyponiemen

      shunt
      Zelfstandig naamwoord
        • implant consisting of a tube made of plastic or rubber; for draining fluids within the body

        Hyperoniemen

        shunt
        Zelfstandig naamwoord
          • a conductor having low resistance in parallel with another device to divert a fraction of the current

          Synoniemen

          Hyperoniemen


          Voorbeeldzinnen

          1. shunt the different track circuits used on our conventional network:
          2. Excitation: separate/shunt/series/compound [1] Strike out what does not apply.
          3. Minimum axle load necessary to shunt certain track circuits is determined in a requirement for safe function, relevant on some main lines in Austria with 100 Hz track circuits according to the infrastructure register.
          4. Minimum axle load necessary to shunt certain track circuits is determined in a requirement for safe function, relevant on some main lines in Austria with 100 Hz track circuits according to the
          5. Minimum axle load necessary to shunt certain track circuits is determined in a requirement of EBA (Eisenbahn-Bundesamt), relevant on some main lines in Germany in the area of former DR (Deutsche Reichsbahn) with 42 Hz and 100 Hz track circuits according to the infrastructure register.
          6. Minimum axle load necessary to shunt certain track circuits is determined in a requirement of EBA (Eisenbahn-Bundesamt), relevant on some main lines in Germany in the area of former DR (Deutsche Reichsbahn) with 42 Hz and 100 Hz track circuits according to the infrastructure register.
          7. Minimum axle load necessary to shunt certain track circuits is determined in a requirement of EBA (Eisenbahn-Bundesamt), relevant on some main lines in Germany in the area of former DR (Deutsche Reichsbahn) with 42 Hz and 100 Hz track circuits according to the infrastructure register. No renewal.